Flow Control Norway AS customize project specific documentation according to SMDL when required.

  • Documentation requirements are normally received as a part of the technical requisition.
  • All deliveries from Flow Control Norway’s stock includes drawings and certificates.
  • The SMDL received from customer will include documents relevant to the actual contract.
  • Flow Control Norway will review the SMDL, add suppliers document numbers and transmittal dates prior to customer approval.
  • Based on approved SMDL (status 1) the documents will be prepared according to the specific project document numbering system.
  • Flow Control Norway establish a documentation log for each project, and this log are continuously updated through the project stag.
  • A customised document will contain: customers document frame, front sheets, all relevant information such as project name, numbers, codes, logos, etc